Wednesday, January 24, 2007

The origin of trouble

This issue was reported to me by a fellow Revit user.

The user had created some door families that had a user named reference plane with the "is reference" property set to either strong or weak (he had already used Revit's pre-named reference planes). He used this reference plane to define the origin of the family, as well having a dimensional constraint to the reference plane. When he attempted to switch the family in a project with a similiar family he received constraint error messages causing the family(s) to fail.

This an edited response from Autodesk support:

The only stable references in the family instance are those produced by reference planes designated as named references (that is top, bottom, right, left, etc...). In the families that you created the reference used for alignment (and assigned to define the origin) is a weak reference in both families (referring to families submitted to Autodesk), so it's unstable, and the dimensional parameter fails when the family is replaced (via the type selector in a project).

They (Revit factory) have edited both families and set "Is Reference" of the Reference plane to "Right". Now the reference can be aligned and the instance can switch families.

To sum it all up, use the built in "is reference" names to define reference planes that will also define the origin for the family.

Hope you all find this helpful.
-R

Tuesday, January 16, 2007

A couple of thoughts on walls

We've had some questions come up regarding wall joins. As is typical I can't manage to recreate any actual problems, but I can illustrate some of our general reccomendations to deal with wall join problems.





One of the biggest causes of wall heartache comes from wanting to construct our models in the way we think of our buildings (which makes sense when we're supposed to be virtually building the model). However, in conditions where we think of walls as being continuous vertically, we tend to create more problems for ourselves. Revit doesn't really like it when you have vertical walls that run across multiple levels & and multiple walls that go from level to level intersecting the continuous wall (see image to right).







Now, as I said at the beginning, I wasn't able to actually re-create any problems. However, in my experince I've seen similiar situations create problems with the wall join conditions. Revit gets confused about how it should be resolving the various join conidtions (especially if the walls have different materials and layers).







The easiest and quickest way to resolve this issue is to use the split command (thats right, it will work horizontally). I tend to find though that it works best in a 3D view. I usually like to split the wall approximatley where I need to seperate the wall, then I go back and make numerical adjustments in the properties of the wall "pieces". (See image below)






Another thing that is quite helpful (especially with curtain walls) is you can choose to dis-allow joins on specific wall's ends. When you select a wall you can right click on the blue handle at the end and you'll get a context specific menu. One of the options is to "disallow join" this will prevent Revit from attempting to automatically resolve the wall join conditions when two walls meet.





This is particularly helpful when dealing with curtain walls. Curtain wall join conditions can get particulary harry, especially when embedding curtain walls into basic walls, or working in corners.





However, when you do use the "dis-allow" join setting, graphically the walls won't clean up correctly. To fix this you can use the "join geometry" command from the tool bar. This command will force Revit to grapically clean-up the linework, however it won't effect the setting "dis-allow join". There is a difference between Revit's automatic resolution of wall geometry "wall joins" and the the effect(s) of the "join geometry" commnand. See the images below for the "dis-allow joing command. The image on the left shows the blue handle you need to right click on, the image on the right is the context menu.



Tuesday, December 05, 2006

Job Opportunity (position filled)

The job has filled, thanks for the interest.

So.... my firm (whose name I tend to leave off this blog) is seeking a highly motivated proffesional to move to our foriegn office to provide (I hate to say it) 2D Autocad management, and...... BIM & Revit management. We have recently launched our first Revit projects in the office (see earlier blog post), and the staff is very excited to begin using this new tool. Right now we have architects, interior designers and structural engineers working in Revit in our overseas office. The office is composed of highly motivated staff working on some of the largest and most interesting projects in the country. The ideal canidate should have experience in managing 2D CAD, experience with Revit and be highly motivated to work with a BIM implementation team to move our 700 person firm towards 100% use of BIM by.......... (trust me its soon) :).

Please feel free to contact me via AUGI private message, or contact the firm directly.

Cheers,
-R

Follow-up to AU class on roofs

Hey all, had a great time at AU in Las Vegas! At least one picture of me and several other folks have made it on to the AUGI website. I got to attend Scott Brown and Scott Davis' class on creating roofs. I don't usually do straight forward tips & tricks but here is a little of my own follow-up for their course.

During the class the guys showed how to create a roof using a mass element, this is handy for unique conditions, or repetitive unique condidtions, like roof crickets, or warped/sloped flat roofs. In their example they used a blend to create a more unique condition, however for my little tutorial I used some blander mass shapes to create my roofs.


I started by creating a mass object that represents the reptitive portion of my roof.
Then I created a roof by face and grouped the roof. From there the group can be arrayed.














Once the first group has been arrayed you can go back and modify the mass, and create a new roof by face. Group the new roof, then you can select your remaining groups and change the group type to match your new group.

The advantage of this methodology is that for a repetitive roof element you only have to manage one mass object, as opposed to defining multiple mass objects. You can even rotate, move and mirror the group throughout a model. You can't include the mass object in the group, as the roof by face command can't re-create the roof object, it looses its assoication. If you're not going to need your old roof object make sure to delete the group. While groups can sometimes be problomatic with large number of elements, you should not encouter too many problems with some simple roof elements. This technique should prove especially useful for any project with large repetitive roof structures.

Sunday, November 26, 2006

See You at AU

Starts tomorrow (Monday) for me. Look for my AUGI avatar!

Cheers,
-R

Friday, November 17, 2006

Foriegn Training



Ahhhh!!!! Since the beginning of the month things have just been crazy! I was in one of our other stateside offices to give advanced family training to our MEP engineers who are starting to explore Revit systems, and now I'm in our foreign office for about a week to do Revit training with a 20 person team to kick off a new Revit (and first) Revit project here. Thankfully I'm not alone trying to teach 20 people, but the experience has been great! We already have them working in their project files! I've attached a couple of my very poor night pictures, so if you can figure out what its a picture of, you might have chance of determining what country I'm in! In any case I'm back in the states next week (Tuesday) then Thanksgiving, and then AU! I'm looking forward to AU as an intense vacation!

One of our biggest problems in hopping the pond to our foreign office is that we have very little custom Metric content. Though we've very quickly got a project template started for them, and we are working on a titleblock, buts its all very fast and very insane. Before leaving I will be teaching my intensive family training course to users who hadn't even touched Revit until this past week!



Cheers,
-R

Friday, November 03, 2006

Philly Revit Users group

Some of us are trying get something started in the Philadelphia area by way of a dare I say it "users group" while nothing very official right now. Please feel free to sign up for the Google Group we've set-up, trying to plan some sort of happy hour for the first week in Decemeber, before the holiday crazieness takes off, but after AU.



Google Groups Beta

Philadelphia Revit Users

Visit this group

Tuesday, October 31, 2006

Integrated Practice

This morning I had a chance to go to an AIA breakfast on Itegrated Practice (IP). It was led by Norman Strong, FAIA. Most of the people in attendance were prinipals, owners and managing partners of architectural firms from around our area. The great thing about this talk was that it was focused on how BIM allows IP, and how in reality to fully immplement BIM, and your BIM tool of choice, a firm must realize that what is required is a change in the way we practice. Firms cannot rely on their IT person or deptartment to immplement "BIM" IT can certainly help and support, and lead the training on a specific tool. However, should we fail as professionals to realize that we must alter our approach to practice then "BIM" will never be more than a glorified CAD package. An interesting point made by one of the other speakers at this morning's engagement was that when the industry transitioned from hand drafting to CAD the "experts" promised 3%-5% improvement on our productivity, however when you do all the math, we haven't really improved our efficiency. This can lead to two conlusions, a) either CAD did nothing to improve our efficieny, or b) as business people we managed to find a way to give away any improved value/productivity that resulted from our adoption of CAD. This is extremely troubling. Not only do we need to determine how to change our practice, but in doing so we also need to determine how to maintain our value, while sharing risk & reward, so that our clients and consultants see the value we can and do provide.

-R

Monday, October 30, 2006

Yet another Blog graces my links list :)

Yes, if you are a regular reader of Revit & BIM blogs, you probably already know about James Van's blog. He was nice enough to leave me a comment, so I'm returning the favor by linking to his blog, "All Things Bim".

Thanks to the new RevitCity 2.0 for also posting a link to my blog!

-R

Thursday, October 26, 2006

Tracking Your Families

I thought I would share a technique we've appplied to all of our family creation which helps a little bit with keeping track of families, and knowing where they came from. In any new family that gets created at my firm, or if a family is downloaded from a site like RevitCity or AUGI, we ask that the users add three text parameters under the "Identity Data" heading;
  • Version Number
  • Source
  • Author

In the case of creating a new family in the firm, version number would typically start at 1.0, Source would be the firm's name, and Author would be the author's name. For families that are produced by contracted consultants, Source would be the consultant's name, and author the employee of the consulting firm that creates the family. For downloaded content, source would be the website and author would be whatever the username is of the contributing "original" author, or as best can be determined. As part of integrating these three parameters with the process of creating new families we are planning/hoping to add them to all family templates so that the end user merely needs to be concerned with filling the parameters out. When creating new families in our firm we also require end users to provide a description, an assembly code (when it makes sense) and a keynote (also when it makes sense).

Why go to all this trouble? The tracking parameters help us to know where a family came from if it is in circulation. If we have the author and a version number we can to a certain extent more easily track down problems. If the author still works for us, we can just go back to them, version number helps, because there might be a more recently updated family that addresses the problem the user is having with the family. By requiring the descriptive data we are "future proofing" ourselves as we use E-Specs more, or if we work with contractors or other consultants where this type of data can be important, or if we figure out new and innovative ways to make use of the data.

We also include a version number in our Project Template file, which exsists as a project parameter under Project Info, no end user is ever going to bother touching it, and most people probably won't ever notice it. However, once again, if there is a problem with the template we can know what version the template is, furthermore everytime the template is updated we have an excel file where we track the version numbers and changes, thus, we can know what might be missing from an older template and or what needs to be updated to resolve an inherent problem with the template.

There is one downside to the "versioning" of our families, when reloading, even when "overwrite parameters of existing types" is selected the version number does not always update, which is rather unfortunate, as it makes it harder to track what version of a family is loaded into a particular project. Hopefully in the future Autodesk will provide some resolution to this issue.

Thanks for reading,

-R

Wednesday, October 25, 2006

New Search Tool

Google has released a new custom search tool. I've added it to my blog to the left. Right now it searches a very limited number of websites. Over the next few days (ahhh, weeks... :) ) I will try to tweak it. I've given it a limited number of Revit related keywords which are supposed to help with the search results. If you give it a try leave a comment and let me know what you think. If you post a url of a Revit website I should be searching it will make it easier and faster for me to add to the search.

If you're a fellow Revit or BIM blogger (and I know who some of you are) and are interested in collaborting on building the search, and including it on your own blog, drop me a comment, or if I've already been in touch with you via other digital communiques contact me that way.

Cheers,
-R

Monday, October 23, 2006

Improving Family Performance

There is a very simple method that can be employed to improve family performance when loaded in a project, the technique makes it much easier for Revit to "draw" views as it doesn't have to calculate anything with regards to cutting through the family's geometry. Using symbolic lines to represent what the family looks like in a specific view type (plan/RCP, elevation front/back, elevation left/right) with visibility settings set to turn off 3D geometry, allows Revit to automatically render the symbolic lines in the particular view, and ignore the 3D geometry. Revit doesn't have to calculate what the family might look like if it is cut by the view plane, or even if the family is being cut by the view plane, it simply displays the symbolic geometry. However there is one slight hitch, if you're working in any type of 3D family, and draw symbolic lines, when you place the family into a project you'll "see" right through the family! See the image to the right.

To fix this problem you need to create a detail component and nest into your 3D family. Detail components (2D geometry only) allow the use of filled regions (which thankfully can block patterns!). If you create a parametric detail component with a filled region, you can then nest it, and attach its parameters to the parameters of the 3D family. Once this is taken care of you can succesfully load the family into a project and get the results of the table on the left.

I highly reccomend creating a rectangular detail component with a filled region, with the lines set to "invisible", you can then use this component in a variety of situations. If you do not want the filled region to have a pattern or color, make sure to set the type properties of the filled region to "no pattern" and not a solid fill color. If however you want a material pattern you can choose whatever you like. You may also want some filled region detail components for other common shapes like circle, L, etc...

Setting the parameters to instance based will give you shape handles when the component is loaded that can be quickly grabbed & locked. These filled region detail components can be handy for detailing in project views too, rather than having to always create filled regions every time you need one. Instance parameters will make it so that you don't need multiple types.

Wednesday, October 18, 2006

New blog (though you've probably already seen it)

Because I like what she has to say, I've also joined the chorus of fellow Revit bloggers and added Laura's blog about using Revit in the contracting world to my list of links. Thanks to David & Steve where I found her, don't know who was the first one to pick up on her blog. Hopefully my firm can do some work with Tocci, seeing as we have a Boston office....

Here's to Revit!
-R

Tuesday, October 17, 2006

Reference Planes in Families



When creating parametric families we've found that the best way to control the dynamic geometry is to create a skeleton of reference planes to which dimensional parameters are attached. Once the skeleton works as expected we create geometry that we attached and lock to the reference planes. However recently we've discovered one minor issue that family authors should be aware of when using reference planes in creating families. On several occasions we've had symbolic geometry randomly showing up in views where it shouldn't. For instance an interior elevation had casework door elevation swing lines showing up when the cabinets were on the other side of the wall (see figure to right). Or, we've had door elevation & plan swing lines show up in views where the door isn't visible. The culprit in all cases has been "extra" reference planes that aren't being used in a family. What makes it even harder to track down is the offending reference planes are often in nested families. In both cases of the casework doors and regular doors it was a piece of hardware that was causing the problem. The hardware was created a "generic model" and the template used included some pre-defined reference planes that weren't required for the handle, because the reference planes were pre-defined they couldn't be deleted, and the author simply left the planes where they were. In the case of the handle, even though the planes were only a couple of feet away (see the figure bottom right) from the origin the handle was so small that it caused problems. In this case the solution was to move the reference planes in extremely close to the geometry so as to stop causing problems.

Cheers,
-R

Wednesday, October 11, 2006

Construction Administration & Blog upgrade

You might notice a few differences, I took the plunge and upgraded my blog to the current Beta, I like it a little better, and I hope you do to. If you're not using IE or Firefox you may have problems viewing the blog, sorry folks, blogger says they're working to fix it all.

Construction Administration (CA) of a Revit project seems to be becoming a hot topic. There have been a couple of threads, some new, some ressurected, showing up on AUGI. Currently because of our average project sizes we are reccomending that projects should expect to export a full set of DWG documents when the Construction Documentation (CD) phase has ended. Generally we've found that while plans export very well, and sections generally do, we find that we need to do clean-up on elevations, and some general housekeeping on the other views. While on a very large project, it might take week to do this, we think its worth it. So far, from what we've seen when you have a large revit project, on a tight site, with a tight schedule, and unforseen conditions (that never happens right ;) ), Revit just doesn't lend itself to quickly producing RFI sketches and addendum. We want to keep the Revit model involved, but at the same time we need to face the realistic needs of our project teams.

Furthermore, the other kink in Revit is not being able to have a view on more than one sheet, this makes it very hard to issue an addendum sketch, and have the same drawing on the original sheet. There are some lenghty dicussions on AUGI about this topic, but suffice is to say, work arounds are just sometimes a pain. CA is fraught with enough difficulties, we don't need to make it harder for our own staff.

Hopefully Autodesk will find time to address this portion of Revit's use, and of course we will continue to encourage them to do so. :)

Ciao,
-R

Thursday, October 05, 2006

Family Clinic (learning to create parametric families)

So the other big thing that happened before going to San Fran & the west coast was that I held an intensive day long advanced family creation clinic (my pastor thought this was a little sketchy sounding ;) ) based around my firm's family standards as defined by the family outline specification that was one of my first blog posts. The training session started with about an hour and half going through a power point that I created that illustrates best practices for creating solid parametric families that are easy to diagnose and distill; as long as everyone follows the rules such as; always name reference planes, and categorize your parameters, don't let them all sit under the "other" heading. There are more.... :) but you gotta come work for us first ;).

After the powerpoint, which was interspersed with live Revit demos to illustrate various points, we moved on to creating a family. Here's a pic of what I told them they would have by the end of the day.

Specs:

2 pick family with arrayed nested cabinet family that can be user modified, doors are also nested and interchangeable. As a bonus they're challenged to write the formula that will limit the number of cabinet instances so that they don't extend past the overall length (yes I did write the formula as proof of concept).

All of them did it (I had about 8 people in the class, course my CIO was reading his e-mail, didn't see Revit open on the laptop ;) ). It was a fantastic training session and we covered just about everything related to families. Workplanes, subcategories, parameters, formulas, shared & nested families, visibility settings, shared parameters, keynotes, and of course general best practices on building complex families. Everyone felt that the course was a great success, and I was very happy with the results. I was very fortunate in that one of my co-workers in the course is a note taking nazi and she has provided excellent written documentation of what we did, making it much easier to make it repeatable and tweakable.

At the start of the day I provided them with a CD that included the power point, a PDF synopis of key points to remember (printed too), the required family templates, keynote file, shared parameter file, excel file of the firm's additional subcategories, and examples of the finished families, and the doors (I pre-made them for them). My favorite part though was that I was also able to include progressive copies of the families. By setting the number of back-up copies to 250 I was able to create a sequence of files by saving after every major action as I created the families. In the end I have 14 sequential files of the base cabinet, they proved very useful as I had a latecomer to the class, and I was able to catch him up ASAP by simply opening one of the 14 files and he was ready to go.

All in all this was a great experience and I was very satisfied with the results, and everyone who participated thought that it was great (though a long day). Now though, I know where I can break up the course to do it in shorter smaller parts. In addition to teaching the course internally, I hope to take it public at some point (with some modifications ;) ). I look forward to doing it again and perfecting it. :)

Cheers,
-R

Saturday, September 30, 2006

Return from the dead.... BIM planning!

So... I've been AWOL for a month, between deadlines & a wonderful vacation to San Francisco and Napa Valley I was a bit busy. :). However lots has been going on in the world of BIM at my firm.

First! Well there was stuff here, but it went away, if you were lucky enough to read it, well you were lucky. If not, sorry, come work at my firm, you'll learn even more.

substitue text, not quite as interesting sorry:

We continue our efforts to document our procedures and how to use Revit on a project. We have developed written documents that help a project team to determine if a project should be done in BIM & Revit. Once that decision is made we've developed documents meant to assist the project team in getting started, and things they should do as they're project moves ahead. We are also working on developing in house resources to better share ideas, tips and techiques between all our offices, that encourage the participation of everyone, and not just the BIM team.


More to come this week... I have some other great stuff. If you all are curious I will be at AU this year (my first :) ) needless to say I'll be in Revit classes, as will several other folks from my firm, looks like we'll have about 4-5 people at AU.

Cheers!
-R

Wednesday, September 06, 2006

Some advertising and new family development

Since at least one blogger recently mentioned that he stops in from time to time, I thought I would put up a few of the blogs I read on a regular basis as a thank you.

Daniel recently gave me a shout out, so if you didn't get here from there, go visit him: Revit Job Captain

David's Blog is great! I don't have to worry about coming up with cool little tips and tricks cause I always know I can stop by his site, or send a user there to learn something. Revit Beginners

I wish Shaun and Mike would be a little more consistent (but I probably shouldn't talk :) ), but when they do post something its usually pretty good. Revit Family Man

And of course Steve Stafford (who already has two links in the side bar) if you're using Revit and don't know who Steve is, then dude or dudette, you need to read more and join AUGI!

I'm working on cooking up some good stuff right now, as is the whole BIMplementation team, hopefully I should have some good stuff to report on in a couple weeks.

Currently I'm working on some pretty sweet parametric elevator families that make use of both nesting & shared families. The biggest issue I'm having though I can't completely control the visibility of objects the way I'd like to unless I throw a bunch of visibility switches into the type parameters, which given its an elevator, would only make it ever more complex! I've shared/nested the elevator cab with a type parameter so we can have couple of basic elevator frameworks that a team/user can put in whatever type of elevator cab they need, double door/single door, some other custom cab.... My current cabs do however allow the user to choose either centered door or offset door with a flip of a switch. I debated about having one cab that you could also choose if it was a double or single door, but decided it was adding an uneccessary level of complexity as I would has to do alot of controlling of voids to move them out of "cutting range". I know that you can do this, but the old fashioned 3D modeler in me isn't quite sold on having random unused pieces of geometry hanging around in families (seems like a good way to potentially slow your model down for no good reason).

I've also included a fair number of shared parameters in the elevator family(s) so that essentially a project team will be able to create an elevator report, that shows exactly what they need for each and every elevator in their building. All the dimensions and information that architects would be concerned about. I know some of this info could be included by just creating new parameters in a schedule, however this opens the possibility of inconsistency from project to project. Whereas if we build the info in the families from the get go it is much easier for the end users who perhaps are not, and never will be super duper Revit experts, and in a 600 person firm, we are never going to have super duper experts for every project & project team as we move to 100% BIM. Therefore, we need to make these easy and simple!

Cheers,
-R

Monday, August 21, 2006

Mathmatical Forumlas in Families

This post actually comes from my friend David who orginally posted it on AUGI. Since I can never keep track of items in forums I decided to repost it here. Enjoy.

---------------------------------------------------------------------------------------------

Not a math genius, or even a Revit one (or else I would have spent way less time figuring this out) but I think I have a way to deal with the "Inconsistent Units" error message. I had a problem in which I needed to calculate the arc lengths of some segments. I used a slightly different method (from previous posters, Ed), but the critical piece (the "Inconsistent Units" error) was the same. In the end I realized that Revit, just like my Chemistry teacher, expects me to cancel units in my equations. Even though WE know that the units cancel out (and that Pi is unit-less) Revit is quite literal: Pi is a number, arc length is an angle, radius is a Length and so on. It cannot see how you could possibly relate them with mathematics.

As you realized, you can trick Revit in a couple of ways, I am attaching a screen shot of two examples. In the first (Green Arrow) I added incorrect units to values. You can see this makes the equation "work" but yields an answer in degrees whilst we want feet and inches. The second way, (red Arrow) is to break up your equations so that portions of them yield "unit less" values, and then combine them at will. Of course you could get this functionality in a single equation, so long as your units all cancel to yield whatever parameter type you are supposed to have.

Wednesday, August 16, 2006

keynotes

This will be a short post... Not enough time in one day to get everything done.

We are excited by the prospect that the new keynoting feature that Revit 9 brings to the table, however we are quickly realizing that in a firm of 600 employees it presents certain problems that one might not typically run into in a smaller office environment. For instance, given that we have 7 offices or so, needless to say there are a number of project managers and architects who have their own thoughts and opinion regarding how drawings should be noted and what notes should or shouldn't include. Therefore we must take the default keynote list that ships with Revit and evaluate it against what our PM's expect, and the contents of our standard outline specification.

The way keynoting works is a complete reverse from how architects have typically noted their drawings. In the past we of course drew some lines (or extruded some shapes, whichever) and the added notes later to describe what the "lines" represented. Now, with keynoting, done correctly, all the thinking needs to occur ahead of time, as the object is being modeled. Of course its possible to use more generic keynotes early on before the detailing of a building has been completely thought through (place holders as it were) (see Daniel Hughes' recent post) but needless to say this is still a new way of thinking regarding documenting a building. This is where it is important to make sure that above all else Project Mangers understand the process of BIM, even if they don't necessarily know everything about how to use a specific piece of software, BIM training.

The other opportunity that the keynote feature provides is a way to close the loop of Revit -> Especs -> Revit. Now it will be possible to model the building, extract the information from the building model to create an outline specification, have the spec writer further develop the final project specification, and then modify the keynote table to match the final specification. This shows us that for each project we need to expect to make a local copy of the BH typical keynote file, so that each project can modify it as needed per project specifics.

One last thing that keynoting now allows, 11th hour modifications to a drawing set without having to actually change the model or its geometry. For instance say you have a project where you've specified slate roof shingles, at the last moment its determined that you need to use asphalt shingles instead. In most cases you would probably want to actually change the model, but now if the shingles are keynoted, all you really need to do is modify the keynote of the roof, if for some reason you don't want to actually change the model at that time.

Cheers,
-R