The new sub-roadbed is 15/32" plywood, a bit more rigid which should be good for the curves. I ended up re-enforcing the thinner 3/8" plywood I used originally as I was not satisified it would stay flat. Some scrap pine and maple did the trick with some wood glue.
I also pre-drilled the hole pattern for the Tortoise Switch Machines from the top down, this should make installation much easier later as the holes are started and I don't have to mess with finding center-line over my head under the layout. I don't know if others use this approach, but it just makes sense! The sub-roadbed will be covered over (so who cares about a few holes), so as long as you can mark where the throw rod will be, you're good to go. I'm looking forward to a significantly easier switch machine install in the future. :-)
Lastly I've had to think some about electrical blocking as I will need a reversing section since I have a return loop. Currently it looks like my max train length will be ~6 1/2'. This should be ample given the size of the current layout and I can do thinks like put detection on cabooses with DCC decoders or resistors for signaling, automation and full train detection, etc. in the future.
Till next time; toot, toot!
New sub-roadbed test fit with track. |
Reinforcement of sub-roadbed |
pre-drilled holes for mounting switch machines underneath. |
This straight-away leading into the reverse loop will be the auto-reverse power block. |